Site Hoarding Bracing

Site hoarding systems can be split into two different categories of bracing, “in-ground” or “on-ground”.

In-Ground Site Hoarding

In-ground site hoarding is where, in order to install the hoarding system, some level of ground excavation is required for an essential component of the hoarding. In most cases steel tubes are dug into the ground and filled with concrete before being fixed to the site hoarding panels.

On-Ground Site Hoarding

On-ground site hoarding requires no ground excavation, instead it uses weighted ballast that sits on top of the ground surface which is generally fixed to the hoarding panels with steel tubes. This type of bracing often requires particularly heavy ballast such as concrete kentledge blocks or water filled ballast tanks.

As well as standard concrete, Blok ‘N’ Mesh’s technical team, now offer an ultra-low carbon concrete mix (ULCC), resulting in the embodied carbon rating being reduced by 71% when compared to using the traditional concrete ingredients, and yet will still comply with British Standards for structural use.

Wind Calculations

Site specific wind calculations are vital for any site using a hoarding system. Without adequate ballast for the site location and environment, the solid structures can be particularly susceptible to wind. Unlike temporary fencing, which is predominantly air permeable due to it’s mesh facing, wind hits the solid panels of hoarding and must be correctly secured for safety.

A wind calculation, which is available from us at Blok ‘N’ Mesh, will assess the site location with the hoarding system used to determine the recommended installation and type / quantity of ballast required to minimise the risk hoardings falling or sliding.

Can’t find what you need?

Do you have a question or are interested in starting a project? Just fill out the form and one of our team members will be in touch by the next working day.


01226 654 040

    How Can We Help You?

    Fill out the form below and one of our experts will be in touch to help start your project!

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
    Item added to cart.
    0 items - £0.00